90-unit project consisting of 72 houses and 18 flats with full infrastructure

RESIDENTIAL CONSTRUCTION PROJECT IN HODDESDON, HERTFORDSHIRE FOR TAYLOR WIMPEY - HIGH LEIGH GARDEN VILLAGE

Project Description


90-unit project consisting of 72 houses and 18 flats with full infrastructure

Client: Taylor Wimpey
Start date: January 2025
Completion date: December 2026
Value: £7.2m
 

Project Details


  • GPS controlled earthworks modelling, surcharging and stockpiling
  • Last phase of multi-phase project total value £35m
  • Piling platforms
  • Piled foundations and ground beams
  • Deep trench fill foundations
  • Substructure brickwork and low U value PCC floors
  • Private and adoptable SW and foul drainage
  • Attenuation basins with headwalls and outfall into local brook
  • Silt protection barriers
  • Flow control manholes
  • Adoptable carriageways
  • Private carriageway, permeable and impermeable drives
  • Private paths and patios extensive steps
  • Tobermore Walls (retaining heights up to 4m)
  • Reinforced concrete and masonry retaining walls
  • POS hoggin footpaths
  • Private and mains services with substation
  • EV charging, streetlighting and connections
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Residential Construction Project in Hoddesdon, Hertfordshire for Taylor Wimpey - High Leigh Garden Village
Residential Construction Project in Hoddesdon, Hertfordshire for Taylor Wimpey - High Leigh Garden Village
Residential Construction Project in Hoddesdon, Hertfordshire for Taylor Wimpey - High Leigh Garden Village
Residential Construction Project in Hoddesdon, Hertfordshire for Taylor Wimpey - High Leigh Garden Village
Residential Construction Project in Hoddesdon, Hertfordshire for Taylor Wimpey - High Leigh Garden Village
Residential Construction Project in Hoddesdon, Hertfordshire for Taylor Wimpey - High Leigh Garden Village
 
Previous
Next
© Copyright AD Bly Construction 2025